Sign In | Join Free | My himfr.com
Home > Core Drill Equipment >

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

Hengshui Aoxing Geological Equipment Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
     
    Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
    • Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
    • Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
    • Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
    • Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
    • Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers
    • Buy cheap 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig from wholesalers

    150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

    Ask Lasest Price
    Brand Name : Aoxing
    Model Number : XY-150 type
    Certification : ISO9001
    Supply Ability : 30 Sets/Month
    • Product Details
    • Company Profile

    150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

    150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig


    XY-150 is a portable and multipurpose engineering exploration drilling rig, applicable to the engineering geological exploration in fields of industrial and civil buildings, railways, bridges, hydropower engineering, as well as small-diameter foundation pile hole drilling.

    1. Large torque, multiple drilling speeds in an appropriate range.


    2. With 2-wheels trailer, the rig can be moved by towing the trailer.
    3. Capable to drill inclined holes at different angle.
    4. High efficiency drilling with hydraulic feeding structure.
    5. Multiple usages, geotechnical investigation for engineering constructions, SPT soil test, mineral exploration, small size pile hole, water well boring.


    The technical parameter of the XY-150T Drilling Rig:

    Basic Parameters
    Drilling depth45-180m
    Drilling diameter300-76mm
    Drill pipe diameter42mm 50mm AW BW AWJ BWJ
    Gross weight of drilling machine(engine not included)500kg
    Dimension (length ×width × height)2050 × 1180× 1420 mm
    Revolving Plate
    Rated speed60 200 400 610 1100 r/min
    Maximum torque1800N*m
    Driving travel450mm
    Maximum Cylinder driving force20KN
    Maximum Cylinder lifting force30KN
    Lifter
    Lifting capacity24KN
    Bobbin line speed (2 layers)0.20 0.72 1.26 2.8 m/s
    Bobbin diameter125mm
    Rope diameter11mm
    Rope capacity26m
    Oil pumps:
    Displacement:20ml/r
    Normal speed2500r/min
    Normal pressure20MPa
    Max pressure25MPa
    Drive motor
    TypeChangchai ZS1105 diesel engine
    Rated power13.2KW
    Rated speed2200r/min
    weight163kg
    Frame
    TypeSliding type(with base frame)
    Movable travel of drill400m
    Distance between drill and hole-opening280mm

    150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig


    150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig


    Safety hazards of drilling rigs
    1. When conducting standard penetration tests, the operator must keep their hands away from the probe when the centrifugal hammer falls freely to prevent the probe from falling off and injuring the operator.
    2. When the drilling rig is in operation, on-site personnel must wear safety helmets and personnel unrelated to the operation must not approach the drilling rig to prevent the top fasteners of the drilling rig tower from falling and injuring them.
    3. During the operation of the drilling rig, always pay attention to the mud pump behind the rig. If the mud pipe ruptures or the drill pipe is blocked during high-pressure operation, it may cause mud spraying and injure on-site personnel.
    4. Before starting work, it is necessary to check whether there are any safety hazards in the steel wire rope on the winch and the fasteners of the elevator, in order to prevent the steel wire from breaking and the fasteners from falling off when lifting the probe rod, which may harm the on-site operators.

    Quality 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hengshui Aoxing Geological Equipment Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)